PUMA VT1100 Series

HIGH PERFORMANCE VERTICAL TURNING CENTER

Long-Term Precision: Engineered for sustained accuracy, ensuring consistent quality in production over time.
Heavy-Duty Capability: Robust construction and powerful spindle drive enable efficient handling of demanding machining tasks.
Space Efficiency: Compact design minimizes floor space requirements, optimizing workspace utilization.

Highlights

  • Travels - X Axis Travel distance (mm): 580
  • Travels - Z Axis Travel distance (mm): 1000
  • Chuck size (mm): 800
  • Max. Turning Diameter (mm): 1100
  • Max. Turning Length (mm): 960

Control System

    Fanuc

Series description

The PUMA VT Series is a vertical turning center engineered for long-term precision, heavy-duty machining, and efficient use of floor space. It features a robust spindle drive, meehanite cast construction, and integral box guideways, offering exceptional rigidity and stability for demanding cutting operations. This machine is ideal for manufacturers seeking reliable performance and accuracy in their production processes.

Build Your Custom CNC Machine

Configure your perfect CNC milling machine or lathe by selecting from a range of customizable options. Some standard options have already been added to your machine and are pre-selected for your convenience. Once you've chosen your additional features, add them to the quote basket, and our sales team will get back to you with pricing details. Start building your ideal machine today!

Travels

Travels - X Axis Travel distance (mm) 580
Travels - Z Axis Travel distance (mm) 1000
Travels - X Axis Rapid Traverse (m/min) 20
Travels - Z Axis Rapid Traverse (m/min) 20

Tool storage capacity

Machining center - No. of tool station 12

Capacity

Chuck size (mm) 800
Max. Turning Diameter (mm) 1100
Max. Turning Length (mm) 960

Main spindle

Main Spindle Max. Speed 850
Main Spindle Max. Power 65
Main Spindle Max. Torque 7559

Turret

Turret - No. of tool station 12

Dimensions

Length (mm) 2830
Height (mm) 4012
Width (mm) 3305
Weight (kg) 22000

The project team manages the entire process, including delivery, installation, and commissioning of the machine, ensuring a seamless project flow. The project team ensures coordination and communication between the project's parties, including the customer, Duroc Machine Tool, and any third-party subcontractors.